Cable-stayed bridge, Geneva

361A8941

  • Contracting authority :

    OFROU Office fédéral des routes (Switzerland)

  • Years :

    2019 - 2022

  • Project manager :

    Radiance35

In addition to the roadway lighting fixed on the cables, the general principles for illuminating the structure are:

1. To emphasize the horizontality by a line of light along the 80-meter length of the deck, visible from the highway.

2. To suggest the verticality of the cable-stayed bridge mast through amber lighting from its base, gradually fading along its height.

Photo credits : Radiance35